Why injection molding
–Net shape with shaft flanges, gears or insert bosses
–4-24 poles magnetized in a single pass
–Tolerance ±0.05 mm without secondary machining
Materials
Bonded NdFeB (Br 5.5-7.0 kG) for torque-dense motors; injected ferrite for cost-driven auxiliaries.
Typical lead time
Mold 20-25 days; samples from existing mold in 5 days.

